Superintendent

Resumes

logoprint
Superintendent
Full Time
3062405307 [email protected]
313 larocque drive Meadow lake

Qualifications

Superintendents coordinate activities and supervise personnel to successfully complete the project on schedule and within budget. This includes maintaining the highest quality, supervising all trade and field personnel, while administering good construction safety practices with all on-site activities. They oversee the work of the crews, equipment and subcontractors to achieve maximum production in the most efficient manner. I have over 20 years in the oil and gas industry, working as a tradesman and vendor with extensive experience in management .

Professional Development

  • High School Diploma Fort McMurray, AB
  • P.A.D.I Professional Rescue Diver, Edmonton, AB
  • BA Degree Criminology, Saint Maryโ€™s University, Halifax, NS
  • Enbridge 2017 Contractor Safety & Environmental Orientation
  • WHIMIS Train the Trainer โ€“ Feb 25, 2015, ACSA, Edmonton, AB
  • CSTS-09 โ€“ Feb 3, 2016, ACSA, Edmonton, AB
  • EGSO - 2014 - Enform, Edmonton, AB
  • H2S Alive โ€“ Jan 17, 2017 โ€“ Enform, Edmonton, AB
  • Leadership for Safety Excellence โ€“ 2016 ACSA, Edmonton, AB
  • Journeyman Welder, Keyano College, Fort McMurray, AB
  • B-Pressure Welder, ABSA Certified May 11, 2009
  • CWB Welder, Exp Jan 5, 2019
  • CICT Overhead Crane, Exp: Apr 24, 2020
  • CICT Rigging, Exp: Apr 24, 2020
  • CICT Confined Space Entry,
  • Honeywell OSSA Fall Protection, Exp: Jun 28, 2019
  • Elevated work Platform, Touch-Back-Safety Inc, Exp: Feb 25, 2019
  • ACSO Program (Completed 16 courses as of Jun 17, 2017), ACSA, Edmonton, AB
  • Bluebeam Engineering Program Proficient.
  • Schneider & Kimco Controls Operations Proficient

Professional Experience

2014 - 2019 Willbros Canada โ€“ Superintendent Key responsibilities:

  • Develops overall project plan and executes plan through subordinates and peers.
  • Coordinates and supervises all activities associated with the project (s).
  • Directs all field personnel to achieve completion of the project on schedule, within budget, with quality workmanship that conforms to original plans and specifications.
  • Maintains construction schedule, identifies and solves problems.
  • Takes decisive action when confronted with potential project interruptions or delays.
  • Orders materials and schedules inspections as necessary throughout the process.
  • Maintains positive relationships with customers, contractors, supplies and other employees.
  • Prepares schedules and supervises completion of a final punch list.
  • Other duties as assigned.

2017(Small Caps project) Prolium Industries โ€“ Tank Welder & Pipe Fitter

  • Replacing water draw piping at floor elevation
  • Installation of stainless steel coiled piping
  • Repair & installation of floating roof angle iron & rubber liner

2017 (Small caps project) Clearwater Energy โ€“ Fabricator

  • Repair & replacement of mechanical and piping (lost to fire).
  • Fabrication of new piping spools, structural steel, pump boxes and machinery parts.

2014 โ€“ 2016 Willbros Canada โ€“ B-Pressure & CWB Welder / Supervisor 2010 - 2011 Jacobs โ€“ B-Pressure & CWB Welder / Supervisor

2006 โ€“ 2009 Carsons / URS Flint Energy โ€“ B-Pressure & CWB Welder / Supervisor 2006 Platinum Energy โ€“ B-Pressure & CWB Welder

2003 โ€“ 2005 Waiward Steel - Welder

2001 - 2002 Harbour Hopper โ€“ Fabricator

1998 โ€“ 2000 Jacobs โ€“ Apprentice Welder

1997 โ€“ 1998 MSI Pipelines โ€“ Apprentice Welder

Project Experience

  • Enbridge โ€“ Hardisty โ€“ Tank 45
  • Syncrude (Main) Fabrication Facility
  • Enbridge Cheecham Terminal โ€“ E-Building
  • Enbridge Cheecham Terminal โ€“ Diluent Line
  • ConocoPhilips โ€“ Surmont 1 Shutdown
  • Husky Energy โ€“ Sour Well pad Sites
  • Shell Energy โ€“ Xray / Gamma ray Slurry Flow Detection Systems Project (Alberta Energy Commission & Shell oil)
  • Husky Energy โ€“ Pump Jacks
  • Syncrude โ€“ North Mine Crusher Assembly
  • Harbour Hopper World War II Amphibious Water Taxi
  • Syncrude Extraction
  • Enbridge, Superintendent, Removal and replacement of 16โ€ relief line โ€“ Gretna Manitoba
  • Enbridge, Superintendent, Installation of line 65 station pumps bypass line - Glenboro, Manitoba
  • Enbridge, Superintendent, Installation of PCV Upgrades & Replacements Project- Regina, Saskatchewan
  • Enbridge, Superintendent, Installation of relief line, flow meter piping, tank removal and associated civil works-Cromer, Manitoba.
  • Enbridge, Superintendent, Field verifications of Underground Utilities for engineering design of new Salt water brine pond piping, HDD. Installation of NPS 24 Blind flange with densitometer, PIT instrumentation- Hardisty, Alberta.
  • Enbridge, Superintendent, Layout and installation of an NPS 2 Fuel gas line, concomitant with an NPS 12 relief tank vapor gas line, with heat trace package, Instrumentation package- Fort Mckay, Alberta.

References available upon request.

Russell Pelley Personal contact information: Cell_306-240-5307 [email protected]


Share: